Communicated with the lawyer regarding the property lines for both Yuyo and Huelal-Totga. Prepared the film concept for the “Globale” film festival and finalized the movie.
House area: Basic cleaning and tidying of the bodega terrace. Continued work on the gutter construction in the patio: cleared out the bodega, sorted screws, and installed the underconstruction for the roof gutter on the patio canopy. Brackets for the guttering were attached, and part of the gutter was installed. Further tidying up in the bodega, including making a box for screws. Installed parts of the pipe connection from the patio canopy’s gutter to the future tank 6. Then, the missing section of the gutter was installed and adjusted, as rain was leaking past the zinc in some areas.
Cleaned the solar panels and moved them from the old pigsty to the bodega.
In the guesthouse, roof beams were replaced and painted, some roof battens were renewed, and work began on installing new zinc sheets. Old cables were sorted into usable and worn ones. Continued work on the guesthouse roof. Received delivery of Cacha wood and zinc sheets for the roof.
Pipa slope: Cleared bushes with a machete and tidied up wood and coconuts in the area. The Pipa slope and boundary paths were mowed.
Created and sowed a new planting area for red beans in the bamboo bed area. Conducted machete training with the new volunteers, including instructions on mowing and plant care.
Cleaned up the pineapple fields and began mowing. Continued clearing around the pineapples.