CW43. Deconstruction of Biogas-plant wall almost finished. Progress in Guesthouse and crooked house, which became a new floor.

Worked on research and calculating how much Bamboo needed to be modified into Biochar to compensate co2 emissions caused by international flights.

familiarize with the brush cutter (Training for volunteers)

New compost plant: Crushed concrete with Hilti and removed big pieces to the road and smaller pieces in the old pigsty. Cut a small tree which unfortunately would have a conflict with the new roof at the new compost plant. Cut away the iron with a metal cutter.

Old fountain fields: Mowed. Cleaned around the trees and bamboo.

Chilamate fields: Mowed. Cleaned around the trees and the bamboo.

Old pigsty area: Moved cables from one box in the old pigsty to another. Cleaned that box.

Sorted rubble in another box.

Removed wood from one box to another in order to make a huge termite nest accessible.

Large termite nest removed from old pigsty. Infested boards removed. Built a fire and burned the decayed wood.

House plant: Beams replaced in Greg’s room in the guest house. Floor in Greg’s room covered with varnished laurel wood. However, since it still had too much slope, the floor had to be removed again. Wood mounted on the beams to compensate for the slope and the laurel wood floor remounted, which is now even.

Sketches for volunteer kitchen

Prepared the new guest room in the crooked house.

Painted to ceilings of the two new showers bottom and upside.

Made plans for nightstands. Built 3 night stands out of Laurel and Pino. Painted them.

started to build a new frame for mirror in the bathroom.

Built boxes for Screws.

Built a bed and paint it.

cleaned the beet behind the bodega, mowing around the house.

Covered the upper part of the wall in the guesthouse towards the tanks with black tissue.

filled cracks in wall in guesthouse.

finished sleeping room wall in the guesthouse with painted Melina.

readjusted doors and windows in Gregs room in the guesthouse

fixed the ventilator and lamp in doble-room in guesthouse and filled holes in the wall.

prepared one piece of wood for the wall between the tank and volunteers’ kitchen.

painted guesthouse and parts of volunteer’s kitchen (new beams) with Penta

Rooms in the crooked house were prepared for guests.

Future Greenhouse fields: mowed. Cleaned with Machete.

Planning for the attachment of the Cohombo

Cut and prepare bamboo for Cohombo, build scaffold for Cohombo, cleaned the fourteenth sixteenth with the machete.

Bye bye Tabea and Marie :). Thanks for your helping hands at Yuyo.