Introductory round on the property and Machete training with new volunteer.
Tuesday we made a Jungle Tour to the old ocean college camp
turmeric harvested and processed. Captured on film.
House area:
Crooked house:
Gregs room: Shelve decoration painting, Room got cleaned. New lamp installed.
Open office. Gaps in the boarded wall in the open office towards the patio closed with painted laurel wood boards.
New house:
Bathroom: Painted parts of green wall with new ochre color. This is preparation work so a shelve could be fixed there later. Built a nice wooden frame for the mirror. Started to cover parts of a concrete Column in the corner with decorative wood pieces. (Also preparation work where the shelve will be fixed later).
Chilamate room got cleaned for expected Volunteer arrival
Old fountain fields: Mowed
Future Greenhouse Field: Mowed
New Compost Plant fields: Deconstruction of the rest of the wall of the old Biogas plant. Sorted Concrete rubble in bigger and smaller pieces, the bigger pieces were brought to the road, the smaller pieces were brought to a box in the old pigsty. Molding metal construction underneath future zinc roof for new compost plant. Zincroof got attached. Decorative battens were attached to the front side under the roof and battens were attached to the back side for later attachment of a gutter.
In the evening, during a heavy downpour, the rainwater drains around the new composting plant and the old pigsty were followed in order to plan a clever future sewerage system. At one point, a drainage channel was dug because the composting plant had filled up with rainwater.