Property round with the new volunteers, Machete training with 2 persons
Started creating Facebook and Instagram account, concept for crowdfunding, started concept for Finca&forest tour. created a donate certificate. collecting background information on aras, spidermonkeys, urbaniziation, got refused from Facebook again
New Compost Plant Area: Started digging a shaft for a rainwater drainage channel above the new composting plant, and also below it. Distributed the excavated material along the path from the road to the rear entrance of the pigsty to give it a more even gradient. Further earthworks on drainage channels around the new composting plant. Drainage measures around the new composting plant have been reviewed and unfortunately are still inadequate. The ground is still partially flooded when it rains. We figured out that it is coming from the bottom of the wall. Therefore probably all the clay and earth outside that wall needs to be dug out in order to repair that hole…
House Area:
New House: Finished the wooden beam in the bathroom. New installation of breaker for Thermo in bathroom and for molding machine in open office. Started with shelf. Worked on Electricity in Shower and Volonteers Kitchen. Worked on electricity in upstairs office
Tea planted.
Mowing a small part near by the house,
Seventeenth Sixteenth: Cleaned it with the machete and mowed. Dug out roots.
Banana fields: Cleaned with machete an cleared the area off sticks and mowed. Chopped up fallen banana trees and spread them around soil
Dead wood fields: Cleaned with machete an cleared the area off sticks and mowed. Chopped up fallen banana trees and spread them around soil
Bamboo fields: beans planted
Canela fields: Mowed with electric wood whacker
Trip to Volio Waterfalls