Skip to main content
Table of Contents
Print

Harvest assignment R3

Review the check frequency and harvest phase

During each visit, also assess whether the plant still needs frequent R3 checks and whether its current Check interval is suitable. If the interval is unsuitable or the plant has left its active harvest phase, note the Plant No., Individual Name and the proposed change while walking.

After the walk, open Tools → R3 Harvest Checks. Save an explicitly chosen interval, or move the plant from R3 to R2. Moving to R2 preserves its existing interval and keeps it in the regular quarter Harvest Walk. Nothing changes automatically merely because you noted it.

Only press All listed plants checked after every listed plant has actually been checked. Apply assignment or interval changes after confirming that completed visit; changing a plant first invalidates the older task list and prevents its confirmation. If any plant was not checked, leave the task open.

R3 Harvest Checks

R3 plants need additional checks at their configured interval. Follow the due list in the Telegram task, grouped by Quarter and Sixteenth in Harvest Walk order. The list is generated from current assignments and recorded checks.

At each plant, follow the existing species Harvest notes. A check may find nothing to harvest. Record actual harvests separately through the normal harvest intake; task completion creates no harvest, quantity or weight.

Use All listed plants checked only after checking every plant in that delivered list. If any were not checked, leave the task open. The check belongs to the original task date; the actual confirmation time is recorded separately. A changed assignment or interval invalidates the old confirmation: use the next current list instead.

Monday to Thursday, the scheduled quarter Harvest Walk covers its own quarter; the R3 list excludes that quarter. Friday to Sunday, all quarters are considered. Daily plants are checked on Sundays too. For longer intervals, Sundays do not count under the existing setting. A plant with no recorded check is immediately due. No task is sent for an empty due list.

In WordPress, open Tools → R3 Harvest Checks to change a plant’s interval (1–5 days), or move it to R2. Moving R3 to R2 preserves its interval and earlier checks, and includes it in its regular quarter walk.

See Harvest Groups and Harvest Walk.

4 active plants assigned to R3

Plant-specific notes are available on the separate Harvest Notes page; task links lead there.

Categories