Fresh Plantings – Maintain Control Plans
Stefan maintains the temporary control plans for newly planted plants. Open Tools → Fresh Plant Control Plans.
- Review the plants without a plan, and the date clarification cases and manual monitoring requests. Include in plant monitoring, below Regular Care, also admits older or transplanted plants. Choose an explicit Monitoring start date. A known planting date may be proposed, but an AI-estimated date is not automatically used. Manual requests default to today. Do not invent an original planting date.
- Choose a six-month or three-month standard plan for each appropriate plant. Adjust phase lengths and frequencies from the chosen monitoring start to its location, condition and previous experience.
- If no additional checks are needed, explicitly select No additional control needed, and record your reason. This removes repeated assignment requests.
- Change an existing plan or use End plan now when appropriate. Previous decisions and recorded checks remain in the task history.
Day 1 is the monitoring start date. The six-month standard checks daily on days 1–14, every three days on days 15–42, weekly from day 43 until the day before the third-month anniversary, then every two weeks until the day before the sixth-month anniversary. The three-month standard ends at the third-month anniversary. Each phase starts immediately after the preceding phase ends; scheduled slots are anchored to that phase’s first day. Month anniversaries use the last valid day of the target month where necessary.
A late assignment starts in the appropriate current phase. Earlier slots are skipped; it does not generate a backlog. A missed current check remains due, with at most one entry per plant in the daily list. Plan changes also skip slots before the change date. Dead or inactive plants are excluded. Ended and expired plans create no further controls.
The daily assignment task is sent only when there are unresolved plants. Saving all decisions resolves its current list; it does not claim that any field check took place. Follow Check Fresh Plantings for the field workflow.
Adrián receives control tasks Monday to Friday only, at 08:00 America/Costa_Rica. Weekend due slots are combined with the next Monday’s slot into one entry per plant, without shifting subsequent phase slots. Ended or expired plans create no further controls, including delayed weekend slots. Stefan’s daily assignment schedule remains unchanged.
Monitoring phases and calendar-month anniversaries are measured from the plan’s own start date. Planting date and Propagation method remain separate: replanting does not prove a propagation method. Record actual replanting and observations in the existing /zusi work report, identifying the plant. No extra report system is introduced.
On an explicit exception, early end or natural expiry, Include in plant monitoring is reset. The decision and previous checks remain in task history; a completed plan does not repeatedly request reassignment during the original six-month window. Explicitly setting the checkbox again permits a new admission with its own history.
Age estimation after capture is asynchronous. While its job is pending, running, awaiting retry or awaiting application, the plant is not labelled as missing its planting date. Failed or missing estimation jobs remain explicit clarification cases. Once the result is stored, its estimated origin date participates in the six-calendar-month selection; Include in plant monitoring still permits manual admission. Existing reminders are reconciled with completed estimates, preserving their earlier snapshot and updating the same Telegram message. An estimated origin date does not automatically become the monitoring start date.